If the repair “requires” the dismantling and replacement of the risers of cold and hot water supply, then it should be done in compliance with certain rules. Then all plumbing fixtures and communications will work long and without problems.

It should be noted that the process of replacement does not take much time. But before installing new pipes you need to determine their material, which will largely depend on their “performance”. Today, residents of urban homes are increasingly choosing pipes from composite compounds, instead of steel zinc-coated products. A recommended plumber in Singapore is the right person to work on it.

Dismantling and installation work on risers

  • Let’s figure out how to properly perform the installation and dismantling of the risers.
  • It is necessary to begin with the revision of old valves. If it has worn rubber gaskets and stuffed seals, they must be cut off. You cannot leave them for saving, as this can lead to future problems in the operation of the riser. When the old valve is removed, a new ball valve must be installed in its place, directly on the tap itself.
  • The next step in the work is the assembly and organization of joints and threaded joints of pipes. To do this, stock up with sealing material, for example, a stick or flax fiber. Also, special threads of domestic and foreign production have proved themselves well.

Priming and thermal insulation work

Now that all the installation work has been completed, it is necessary to carry out priming and thermal insulation work. For this, it is necessary to have a heat-insulating material of the appropriate quality. It is necessary to conduct protective works without fail, since the absence of thermal insulation often leads to the beginning of corrosive processes. According to the experts, the affordable plumbing services in Singapore are the right options for the same now.

They begin with the appearance of condensation on the pipes, especially in the summer, when there is a shutdown of heating. At the same time moisture can “fall out” both on the standpipe of cold water supply, and hot.

Also during the repair often have to change the sewage. This need arises, as a rule, when there is a decision to reschedule a bathroom or a bathroom. However, to realize this without replacing the old riser from the cast iron, which has chips, fistulas and, without sealing, joints are simply impossible.

For repair work and its result to be effective, the following recommendations should be adhered to:

  • Pipe routing should occur with the use of different collectors when approaching each point;
  • it is better to connect the washing machine using a siphon, to prevent the occurrence of water seals;
  • All communications, sewer risers, hot and cold water risers are better “hidden” in special plumbing cabinets. This provides free access to them in the event of an accident or audit, which is impossible when they are embedded in the walls.

As for the material of manufacture, today the old risers are increasingly replaced with polypropylene products. In this case, the previous riser is cut completely – from the ceiling and to the floor. The result of the replacement will be more effective if the “upper” and “lower” neighbors do the same.

An important point in the installation and dismantling of sewage sludge is the lack of water in the riser system at the time of working with it. Practice shows that the most successful time for this – from 10 am and up to 15 hours. This period is considered the most minimally loaded in terms of water consumption, when most of the tenants are away from home.

 